by T/T, 30% Deposit is required within five (5)-business days from the contract signing date. 70 % is required by T/T after testing the machine or sent profile for buyer confirmation, but prior to shipment of equipment.
Delivery Policy
Delivery time: about 45workdays after received the advance payment
Packing method: Main body of machine is naked and covered by plastic film(to protect of dust and corrosion),loaded into container and steadily fixed in container suitable by steel rope and lock, suitable for long-distance transportation.